Archives: Projects
-

Owens Lake
—
by
Served as the subject matter expert for a condition assessment program related to the electrical and instrumentation assets on Owens Lake
-

City of Pico Rivera Water Treatment Plant No.3
—
by
Designed the replacement of the existing electrical and instrumentation system.
-

Pasadena Water & Power Arc Flash Study
—
by
Performed arc flash studies at 25 booster and/or well stations throughout PWP’s distribution system
-

Security Upgrades for the Metropolitan Water District of Southern California
—
by
During this project we basically did xyz.
